Industries

Post-construction cleaning for general contractors

A cleaning crew that reads a punch list, signs in under your safety program and works to the date you give us, including weekend pushes.

Commercial construction site interior

How an account is run

  • Unannounced walkthroughs

    A supervisor walks your building at random, scores it against the written scope and sends you the score with photos.

  • A person answers

    The office line reaches a person during office hours, and field supervisors carry phones on every shift.

  • Fixed the same night

    Issues are logged when they happen and put right before the next shift, with a note to you.

  • A written scope

    Every task by area and frequency, agreed before the first shift. You keep a copy and the crew carries one.

The brief

What a superintendent needs

  • A crew that shows up on the date it promised
  • Rough cleans that keep dust out of finished work
  • A final clean that survives the owner walk
  • A touch-up after the punch list
  • Sign-in and safety compliance without reminders
  • One contact who answers on site
  1. 01

    Three phases, one crew

    Rough, final and touch-up run with the same supervisor, so nothing is explained twice. The crew already knows the building by turnover, which is also why many projects keep them on for the recurring contract.

  2. 02

    Turnover dates move

    When the date moves, the crew moves with it. Tell the office as soon as you know and the crew plan is rebuilt around the new date.

Extract

How the scope reads for a building like yours

A few lines from each area, with their usual frequency. The full scope is written for your building at the walkthrough.

Final clean

  • WeeklyRemove stickers, labels and protective film from glass, fixtures and appliances
  • WeeklyClean all glass inside and out, frames, tracks and mullions
  • WeeklyDetail plumbing fixtures, cabinets inside and out, light fixtures and switch plates

Rough clean

  • DailyRemove construction debris, sweep slabs, scrape drywall mud and adhesive from floors
  • DailyHEPA vacuum all horizontal surfaces, ledges, ductwork exteriors and top of framing

Touch-up

  • MonthlyPost-punch-list touch-up clean before owner walkthrough and turnover

Build the full scope for your building

Questions

General Contractors questions

How much notice do you need for a final clean?

As much as you can give, because crew size is set by the building. Tell us the date as early as you can and we plan to it, then adjust when it moves.

Do you work weekends to hit a turnover?

Yes. Weekend pushes are normal on a turnover, and they are planned into the crew schedule rather than improvised.

Next step

Walk the building with us

Under an hour on site with the supervisor who would run the account. You get a written scope of work for your building.