Industries

Manufacturing and industrial cleaning

Production keeps running, so the cleaning works around it: break areas per shift, offices after hours, floors on a rotation that never blocks a line.

Industrial building interior with high ceilings

How an account is run

  • Unannounced walkthroughs

    A supervisor walks your building at random, scores it against the written scope and sends you the score with photos.

  • A person answers

    The office line reaches a person during office hours, and field supervisors carry phones on every shift.

  • Fixed the same night

    Issues are logged when they happen and put right before the next shift, with a note to you.

  • A written scope

    Every task by area and frequency, agreed before the first shift. You keep a copy and the crew carries one.

The brief

What a plant needs

  • Break rooms and restrooms serviced on every shift
  • Floors swept and scrubbed without blocking production
  • Office and quality areas cleaned to an office standard
  • Housekeeping that supports your safety program
  • Dust controlled at height before it reaches product
  • Crews who follow lockout and restricted-area rules
  1. 01

    Cleaning that fits the shift pattern

    The scope is written around when each area is free rather than around a standard night shift. Break areas are serviced between shifts, offices after hours, and floor work is scheduled where it will not cross a running line.

  2. 02

    Safety rules come first

    Crews work to your site induction, your personal protective equipment requirements and your restricted-area rules. Anything that needs a permit or an escort is agreed in the scope before a technician is on the floor.

Extract

How the scope reads for a building like yours

A few lines from each area, with their usual frequency. The full scope is written for your building at the walkthrough.

Warehouse floor

  • DailySpill response and absorbent disposal per the site SDS binder
  • DailyEmpty floor bins and cardboard gaylords to baler or compactor
  • WeeklyDust rack uprights, beam faces and wire guards on lower levels

Breakrooms

  • WeeklyClean microwave interior and refrigerator door seals
  • MonthlyRefrigerator interior clean-out on the agreed date (client notifies staff)
  • DailyClean and disinfect counters, tables, sink and faucet

Entrances and lobbies

  • DailyDisinfect high-touch points: handles, rails, elevator buttons, reception counter
  • WeeklyHigh dust ledges, signage, vents and light fixtures to 10 ft
  • QuarterlyInterior window glass and sills, full clean

Build the full scope for your building

Questions

Manufacturing and Industrial questions

Can you clean while production is running?

Yes, in the areas that are free. The scope sets which areas are cleaned during production and which wait for a changeover or a shutdown.

Do you handle production waste?

General and office waste yes. Process waste and anything regulated stays with your licensed contractor, and the boundary is written into the scope.

Next step

Walk the building with us

Under an hour on site with the supervisor who would run the account. You get a written scope of work for your building.